DragonOSA RedPower revival

The network rack

Stack switches and repeaters in a 2-post relay rack, each with its own cable tray, and route cables down the vertical manager.

The 2-Post Network Rack is a steel relay rack: two C-channel uprights with square cage-nut holes. Each block is a section about 3U high.

Build a rack

  1. Place rack sections on top of each other, all facing the same way. They join into one rack, with a top angle at the top and bolted base angles at the bottom.
  2. Use a Network Switch or Network Repeater on a section to mount it. Its ears bolt to the rails, and a finger-duct horizontal cable manager and a blanking panel fill the space above it.
  3. Stand a Vertical Cable Manager beside the rack. It is a 6-inch channel with fingers, a top cap and base brackets.

Mining a mounted unit gives it back and leaves the rack section in place.

Cabling a rack

Clicking a mounted unit's jack lays the cable on the wall face of the block in front, at that unit's height. So each unit has its own tray, with 8 copper and 2 fibre places, and sees only its own cables.

  • Cables along walls run in a band above the units' ports, fibre lowest, so they never cover a port.
  • A cable can turn from the wall onto the floor or down the cable manager inside one block.
  • The cable router avoids the space in front of other units, so its routes go down the vertical manager, as in a real rack.

Tip

Run cables down the vertical manager, not down the wall in front of the other units. A cable laid by hand down the front passes in front of those units' plugs.

Recipes

Recipe Makes
7 iron ingots and black dye 3 rack sections
6 iron nuggets and 2 black dye 2 vertical cable managers

Both are mined with a pickaxe. The exact grids are on the rack and cable manager pages.