The network rack
Stack switches and repeaters in a 2-post relay rack, each with its own cable tray, and route cables down the vertical manager.
The
2-Post Network Rack is a steel relay rack: two C-channel uprights with
square cage-nut holes. Each block is a section about 3U high.
Build a rack
- Place rack sections on top of each other, all facing the same way. They join into one rack, with a top angle at the top and bolted base angles at the bottom.
- Use a
Network Switch or
Network Repeater on a
section to mount it. Its ears bolt to the rails, and a finger-duct horizontal cable manager and a
blanking panel fill the space above it. - Stand a
Vertical Cable Manager beside the rack. It is a 6-inch
channel with fingers, a top cap and base brackets.
Mining a mounted unit gives it back and leaves the rack section in place.
Cabling a rack
Clicking a mounted unit's jack lays the cable on the wall face of the block in front, at that unit's height. So each unit has its own tray, with 8 copper and 2 fibre places, and sees only its own cables.
- Cables along walls run in a band above the units' ports, fibre lowest, so they never cover a port.
- A cable can turn from the wall onto the floor or down the cable manager inside one block.
- The cable router avoids the space in front of other units, so its routes go down the vertical manager, as in a real rack.
Tip
Run cables down the vertical manager, not down the wall in front of the other units. A cable laid by hand down the front passes in front of those units' plugs.
Recipes
| Recipe | Makes |
|---|---|
| 7 iron ingots and black dye | 3 rack sections |
| 6 iron nuggets and 2 black dye | 2 vertical cable managers |
Both are mined with a pickaxe. The exact grids are on the
rack and
cable manager pages.